Allow multi-select for rooms in time tracking
If I am drafting there is a high possibility that I will want to track time to multiple rooms and potentially track against ALL rooms for general design like concept design.
If I am drafting there is a high possibility that I will want to track time to multiple rooms and potentially track against ALL rooms for general design like concept design.
Log in to comment and vote
Comments1
Timothy Murenzi
Sep 17
Multi-room changes the data model: a timelog currently carries one
project_room_id, and "ensure it's tracking that accurately" means deciding what a 3-room, 2-hour entry means — one entry tagged to three rooms, or the time split between them. That answer changes the schema, the reports, and every per-room budget figure. Worth settling before we code anything!